UDOT Realizes It’s Been Using The Orange Barrels As Load-Bearing Structures All These Years

Spread the love

SALT LAKE CITY — In a stunning internal admission, the Utah Department of Transportation confirmed it has been relying on the I-15 construction barrels as structural supports since approximately 2009, explaining why the project can never end. “If we move the barrels, the road comes with them,” said a UDOT spokesperson, adding that the barrels have since been granted tenure. Engineers estimate construction will conclude shortly after the barrels’ own construction project is finished.

Photo: Oregon Department of Transportation (CC BY 2.0), via Wikimedia Commons

Utah Stuff & Top Sellers
Affiliate links — we may earn a commission at no extra cost to you.

Spread the love

Leave a Comment

Your email address will not be published. Required fields are marked *

Scroll to Top